Frankie: Week 11

I hope you enjoy these weekly updates as I learn to navigate through the business of flipping houses.  Check out other posts about Frankie the Fliphouse HERE. I have good news and bad news about this week at Frankie.  The good news is that the bedrooms are nearly 100% painted and will be completed today!  The bad news is that means I was painting aaaallllll week and have no fun exciting pictures.  Well, not NO fun exciting pictures, but not many fun exciting pictures.... the tub did get it's make-over this week.

w11-tub

All shiny and white.  I won't tell the next owners that it used to be pink if you wont!  This makes the bathroom near done!!

w11-bathroom

Still left on the bathroom list is a new window sill (which broke in demo), rehanging the closet and bathroom door, and cleaning.  lots of cleaning.  Also, you'll notice- old ugly windows throughout the house... I'm waiting on those too.  With factory closures over the holidays, I'm still impatiently waiting to hear when new windows can be installed.  The windows'll most likely be pushing our completion date off by a week or 2 (hopefully not more!), unfortunately.

But 2 out of 3 bedrooms are all painted, and all 3 bedrooms have new bright light fixtures!

w11-bedrooms

All 3 bedrooms and the living room are getting painted with Re-Color paint in "Canvas" which I used in the last flip's living room.  This it totally my go to neutral for flips- creamy and neutral without being a snoozer.

The ceiling in the 3rd bedroom started giving me the same troubles that the kitchen ceiling had been giving me and started peeling when it got painted.  Choice words were said.  But I'm following the same method that I did in the kitchen, so hopefully today all I'll have to do is sand it, prime it, and touch up the paint (fingers crossed!!!)

w11-br-ceiling

If the ceiling behaves, the last bedroom will be totally painted by the end of today.  That would make for a very happy weekend.  I still have to paint the living room and finish painting ALL of the doors from upstairs which are politely waiting in line for paint in the basement.

w11-doors

Because I was getting impatient to see transformations, I did move the ReStore dresser up from the basement to the kitchen.  I figure that I'll prime, paint, and assemble it in place.

w11-island

It's like it was meant to become a kitchen island!  Now to decide on a color.  I've always had green in my head.  Even though this is a flip, this piece isn't fixed, so I think I can afford to go a little brighter.  I plan to put this as a negotiable item for the sale, so the buyer will only get it if they want it (and have a decent offer).  It would hurt me to just leave it with the house and see it get tossed once the house sold!

Anyway.... greens!  I'm debating between a brighter and a softer green.  They're both Ben Moore (color matched to Home Depot samples).  On the left is Everglades and the right is Medici Malachite.

w11-paints

Mom thinks Medici's too bright, while Hubby says to go for the brighter to (and I quote) "make it pop <makes popping noise with mouth>."  I keep flip-flopping, so I'd love to hear your opinion!

I have a really good feeling about next week.  With the painting winding down, I have a feeling the last pieces will start falling into place!

Frankie: Week 10

I hope you enjoy these weekly updates as I learn to navigate through the business of flipping houses.  Check out other posts about Frankie the Fliphouse HERE. One very big, very exciting thing happened this week at Frankie:

week 10 kitchen 1

The kitchen cabinets were installed!  I had totally forgotten how big this kitchen is!  It'll look even better with a backsplash and a dresser island- I can't wait!!   The view above is my favorite view in the whole house- you can see the cabinets and the totally done hallway.  Yay progress!  If you don't look at the rest of the house, this view looks almost done.

week 10 kitchen 2

Now I'm just impatient for the countertops to be installed (they got templated this week) so that I can get to the backsplash.  Oh the backslash.  It's gonna be sexy.  mad sexy.  and I can't wait to install it!  Especially since I'm 100% over painting at this point.  I got a ton of painting done this week, but there's still a lot to go.  Painting stained wood trim white in an entire house takes lots and lots of coats... who knew??

Paint roundup:

Kitchen: 95% painted (walls, trim, ceiling, closet: done, but the back door needs a second coat)

Bathroom: 95% painted (ceilings still need touching up)

Hall: 100% painted!! (including the hall closet!)

Back bedroom: 75% painted (all trim is done and there's a first coat on both the walls and ceiling)- this should be 100% by the end of today

Other 2 bedrooms: 20% painted (I haven't touched these rooms in weeks)

Living room: 5% painted (now that it's not taken over by kitchen boxes anymore, I can dig in here next week)

Basement: 0% painted.... I'll deal with this area once the more important upstairs is all done

week 10 closets

I'm especially tired from painting closets.  Among all the other painting, I've painted 3 closets in the past 3 days.  It's a great workout, though, doing multiple layers way up high and way down low... stair stepper and squats all in one.  My legs are thanking cursing me.

In a few much needed painting breaks, I also replaced a few more lights in the house.  Slowly, but surely, they'll all get replaced and be bright and beautiful.

week 10 lights

Whilst I was covering my hands and clothes (and maybe a few walls) in paint, the electrician was plugging away (I didn't notice the pun until I started proof-reading, ha).  As you may have seen on instagram, he replaced all of the old, dingy, yellow light switches and outlets for fresh, clean, white ones.  What a difference!  Even in the unpainted rooms, it looks refreshed!

week 10 switches

In addition, he also fixed the broken doorbell, updated the wiring and added outlets in the kitchen, and started on a box for the sconce above the sink.

With holidays and a last minute vacation in the midst of this flip, it won't be done in 12 weeks like Clark was, but I hopefully won't be too far behind.  I feel so behind when I look at Clark's week 10 update.  Our goal is still to list at the end of January, though.  Weather and window install are the only 2 items that might push it back a couple weeks, but I'm keeping my fingers crossed!

With the kitchen cabinets in, though, this house is finally starting to feel livable again and completion doesn't seem so far away.

Frankie: Week 9

I hope you enjoy these weekly updates as I learn to navigate through the business of flipping houses.  Check out other posts about Frankie the Fliphouse HERE. Sorry for the very very late update today- an unfortunate power outage this AM decided that I wasn't posting until after my work day at Frankie.

I have regained Frankie from the contractors and he's starting to look pretty darn spiffy!  Yes I said spiffy.  Frankie's from the 50's so that gives me the right to use cheesy words like spiffy, neat, and righto.  Got it?

The bathroom has walls, a floor, tile, a vanity, mirrors, sconces, and above all, functioning plumbing!

week 9 bathroom

There's still quite a bit of touch-ups and final touches that'll need to happen in the bathroom (like a tub that's still pink for another 10 days), but I'm comfortable in saying that this room is about 90% complete!

 

week 9 tub

The kitchen's been giving me troubles, though- namely the ceiling.  After scraping and patching the ceiling, I painted the first coat... and it started cracking and peeling again.  So I scraped off the peeling paint, patched it, and painted again... same issue.  ugh.  Here's the recipe that seemed to work in the end: scrape EVERY bit of loose paint (a utility knife worked rather well), sand, prime... THEN patch.  Prime over the dried patch, then finally paint.  It may have been overkill on the steps, but I didn't want to have to repeat myself a third time.

week 9 dining room

As you can see, the walls that won't be covered with cabinets are also painted, yay (minor touch-ups needed) and ready for the kitchen cabinets install this weekend (happy dance!)

week 9 kitchen

The contractors also completed drywalling and adding some doors in the unfinished basement

week 9 basement

And replaced the broken, rusty exterior railing to the side door.

week 9 railing

As in previous weeks, I tried to stay out of the contractors ways by priming, painting, patching, and replacing the hall and kitchen lights.  Sadly, there's still a LOT more priming and painting to do, but this rebuilding phase is my favorite part!  My vision for Frankie is starting to be visible and not just all in my head!