I hope you enjoy these weekly updates as I navigate through the business of flipping houses one house at a time!! If you’re new here (Hello!!!) or just enjoy walking down memory lane, you can see my 7 previous flip houses here. Thanks for coming along for the ride as I jump into flip #8!!! Check out previous posts about this house here and follow along on my insta-stories for more behind the scenes goodness! This post may contain affiliate links. For more information, see my disclosures here.
WE HAVE WALLLLLLLSSSSS!!!!!!
And LOTS and LOTS of boxes.
The moment the wall plastering was done, the kitchen cabinets and appliances got delivered, filling the empty space right back up. Frankly, it was impossible to get pictures of the plastering around the boxes. Just check out the dining room!
My contractors have wasted no time and have already started unboxing and laying out the kitchen today, so I'll have some sneak peeks on insta this coming week.
Upstairs is looking much more polished as well (and less filled with boxes) with all of it's new drywall and plaster. The smaller room got a thin coat of drywall and plaster over it's damaged plaster walls and the larger room which was already drywalled just some patching and drywall on it's new closets.
Things that I didn't get a picture of that also happened this week are:
- a new furnace got installed
- the piles of brush got removed from the yard at long last
- tile and vanities and light fixtures started arriving.
From here on out, there's going to be progress in leaps and bounds for the next few weeks! Tiling should be starting next week along with kitchen install and interior doors. I can't wait!!! If you haven't already, pop on over to todays insta-story where I'm asking your opinion about what grout to use in the main bathroom. I still have several things that I need to figure out design-wise as well! Medicine cabinets, hall lights, kitchen backsplash tile, and a few others! Now that the finish work is starting, the end is in sight!!
Have a wonderful weekend!!!